Trail Work Management "...leaving a footpath for generations to follow." |
| All Sections | Work Needed List | Work Completed List |
|
| Work Needed List | ||||||||||
|
Sec # |
W | Sec Trailheads | Sec Len (Mi) |
Pr. |
Work Needed |
Location/Description |
Reported |
Volunteered for it |
On |
|
| 01a | Springer Mt. - Big Stamp Gap | 1.70 | 1 | Blowdown | Instructional Example: This is a work order submitted by some anonymous hiker. Notice the green background to mark it as `Pending`. It must be verified and changed to Open (enter `o` after Reported date) before it can be claimed to work on. | 2007-11-14 | ||||
| 01a | Springer Mt. - Big Stamp Gap | 1.70 | 1 | Blowdown | Instructional Example: This one was entered by a registered maintainer. Since it`s from a trusted source, it`s already open (not pending), ready for someone to claim it. | 2007-11-14 | ||||
| 01b | Big Stamp Gap - 2nd Cross Trails | 2.20 | 3 | Signage | Signs needed at both crosstrails | 2008-04-14 | T Keene | 2008-04-14 | ||
| 01c | 2nd Cross Trails - Three Forks | 2.10 | 3 | Treadway | 150 yards of side-hill refreshing needed about 2/3 of the way south from Three Forks toward 2nd CrossTrails. Maybe a 4-5 man job. | 2007-10-12 | ||||
| 02b | No Name Gap - Bryson Gap | 3.00 | 3 | Treadway | About 100 yards of sidehill work needed around a quarter of a mile south of Bryson Gap. | 2007-11-17 | ||||
| 03b | Wallalah-Licklog Saddle - Licklog-Rhodes Saddle | 1.40 | 3 | Treadway | Sidehilling needs restoration between Licklog and Rhodes. Likely worktrip. | 2008-01-20 | ||||
| 03c | Licklog-Rhodes Saddle - Skeenah Gap | 2.00 | 3 | Treadway | Sidehilling needs restoration between Licklog and Rhodes. Likely worktrip. | 2008-01-20 | S Hegert | 2008-02-09 | ||
| 05a | Wilscot Gap - Ledford Gap | 2.30 | 3 | Signage | 300 yrds in from Rt 60 the sign is rotting and falling apart | 2006-03-13 | M Dominy, D Bailey | 2007-06-04 | ||
| 05a | Wilscot Gap - Ledford Gap | 2.30 | 2 | Treadway | top 10% of Tipton Mtn to Ledfort Gap needs reshaping | 2006-03-13 | ||||
| 05b | Ledford Gap - Brawley Mt. | 0.90 | 3 | Steps | steps need to be replaced due to ATV traffic 50 yrds east of Brawley Mtn fire tower | 2006-03-13 | ||||
| 06d | Stanley Gap Trail - Weaver/Laurel Cr. Rd. | 2.90 | 3 | Treadway | Ca. 200 yards north of the intersection with the bike trail, about 150 yards of sidehilling needs refreshing. | 2007-11-19 | ||||
| 08b | Hudson Gap - McKenny Gap | 1.50 | 1 | Blowdown | Extra large blow down (42`` diameter at least), partially cut out steps in trunk (passable), needs to be removed completely. About 2/3 way from Hudson toward McKinney Gap. | 2008-01-21 | ||||
| 08c | McKenny Gap - Hatley Gap | 1.00 | 1 | Blowdown | Tree top blocking trail in small cove just east of Hatley (shortly after leaving the ridge line going down into the gap). Mostly small limbs that could be handled by bow saw or hand axe. | 2008-01-21 | ||||
| 08e | Fowler Mt. - Halloway Gap | 2.00 | 1 | Blowdown | 1 mile N of Fowler Mtn. Needs chain or cross cut saw | 2007-11-08 | ||||
| 08f | Halloway - Double Hogpen Gap | 1.20 | 3 | Treadway | Sidehilling needs refreshing on the Dominy Knob reroute, just north of Halloway Gap. 200 plus yards of refreshing needed. | 2007-11-19 | ||||
| 09b | Pinhoti Intersection - Watson Gap | 2.30 | 3 | Blazing | Blazing is good at junction with the Pinhoti, and near Watson`s Gap, but very faded, or non-existent, in between. | 2008-01-02 | ||||
| 09b | Pinhoti Intersection - Watson Gap | 2.30 | 3 | Vegetation | Just day hiking from Dyer Gap to Watson Gap. There is a bit of growth from the Pinhotti junction up the initial climb to Watson Gap. Briars and pine sappling growth. Then lots of wet trail along the Jack River. | 2008-03-24 | ||||
| 10c | W | Hemp Top Trail - Hemp Top | 3.10 | 1 | Blowdown | One: 8`` 2mi n of Sp. Oak Gap | 2007-05-04 | |||
| 11c | W | Fork Ridge Trail - Rough Creek Trail | 1.80 | 3 | Other | This is along the creek coming North to South before you ascend Big Frog from the the North. I have been here twice and it is difficult to figure how to cross the creek and go up Big Frog. Is it at the old culvert which is lying in the creek? I know that this is when the trail enters Big Frog Wilderness and you are not allowed to post the proper blazes. This is the only part of the trail I have done. I`d like to help the BMTA in any way possible. | 2007-12-05 | |||
| 12b | Dry Pond Lead - Kimsey Highway | 2.70 | 3 | Vegetation | At the Dry Pond Lead intersection the briars are pretty bad and the BMT is not very obvious. Again at the powerline where the trail goes north the path is covered with briars. | 2008-01-15 | ||||
| 16a | Sandy Gap - Round Top, State Line | 3.50 | 3 | Treadway | 1/4 mile in need of sidehilling, from Moss Gap toward Sandy. Needs worktrip | 2007-11-08 | ||||
| 16d | W | Brookshire Cr. - Sugar Mountain Road | 2.50 | 1 | Blowdown | Wilderness Area - hand tools only: several small blowdowns need to be removed at various locations on section 16d. Check out www.cherokeehikingclub.org for specifics. Go to the Trail Maintenance page. | 2008-03-28 | R & B Harris | 2008-03-28 | |
| 17d | Mud Gap - Beech Gap, Nantahala NF | 3.00 | 1 | Blowdown | Sat. April 12, 2008 we will have a work day to clean up some blow downs and do some light brushing on section 17d, from Mud Gap trailhead on the Cherohala Parkway, south. Eric Eades and Mike Harwood will lead the work trip. | 2008-03-27 | E Eades, M Harwood | 2008-03-27 | ||
| 19b | W | Slickrock Crk + Ike Br Trls - US Hwy 129 | 3.50 | 3 | Blowdown | 0.5 miles south of the Topoco trail head there is a double blow down - one hemlock ~30`` and a hardwood ~20`` right next to each other. They can be climbed over, but it will need cleared. | 2008-02-01 | |||
| 19c | US Hwy 129, Tapoco trailhead - Deals Gap | 5.10 | 2 | Blazing | By AWT volunteer Obie Reynolds: Signs/markers missing for northbounders after crossing 129 bridge. After leaving the highway, sign is found but can not be seen from the road. (Suggest placing on opposite side of treadway so that it\`s visible from the road.) Some blazes need fresh paint. Some sidehill treadway needs rehab. | 2007-05-10 | ||||
W = Wilderness Area; only hand tools allowed.
Green background: work item is pending review; must be opened to accept volunteer assignment.
Gray background: work item is unverified, but can accept volunteer assignment.