| Work Needed List | ||||||||||
|
Sec # |
W | Sec Trailheads | Sec Len (Mi) |
Pr. |
Work Needed |
Location/Description |
Reported |
Volunteered for it |
On |
|
| 01b | Big Stamp Gap - 2nd Cross Trails | 2.20 | 3 | Signage | Signs needed at both crosstrails | 2008-04-14 | T Keene | 2008-04-14 | ||
| 01b | Big Stamp Gap - 2nd Cross Trails | 2.20 | 2 | Vegetation | None. | 2009-06-24 | ||||
| 02b | No Name Gap - Bryson Gap | 3.00 | 3 | Signage | No Name (Owen) Gap Signage Needed | 2009-01-17 | ||||
| 02b | No Name Gap - Bryson Gap | 3.00 | 3 | Treadway | About 100 yards of sidehill work needed around a quarter of a mile south of Bryson Gap. | 2007-11-17 | ||||
| 02b | No Name Gap - Bryson Gap | 3.00 | 3 | Water Bars | Diversions needed on the upslope out of No Name Gap. | 2008-10-20 | ||||
| 05a | Wilscot Gap - Ledford Gap | 2.30 | 1 | Blowdown | Multiple blowdowns in section just past top of Tipton mountain heading toward Ledford | 2009-04-27 | T Keene | 2009-06-15 | ||
| 05a | Wilscot Gap - Ledford Gap | 2.30 | 3 | Signage | 300 yrds in from Rt 60 the sign is rotting and falling apart | 2006-03-13 | M Dominy, D Bailey | 2007-06-04 | ||
| 07b | GA Hwy 515 - Shelter (Sisson`s) | 1.70 | 3 | Signage | Sign entering Sisson property is falling apart. Sign should include ``No camping on private property, next 4 miles. Shelter 1.8 miles.`` | 2008-07-09 | ||||
| 08a | Bushy Head Gap - Hudson Gap | 2.60 | 1 | Blowdown | One large one about 0.25 miles trailnorth from Bushyhead Gap, across the old roadbed just beyond the rhododendron. Chainsaw needed. | 2008-07-05 | ||||
| 08b | Hudson Gap - McKenny Gap | 1.50 | 1 | Blowdown | Extra large blow down (42`` diameter at least), partially cut out steps in trunk (passable), needs to be removed completely. About 2/3 way from Hudson toward McKinney Gap. | 2008-01-21 | ||||
| 08b | Hudson Gap - McKenny Gap | 1.50 | 3 | Blowdown | Blowdown .2 mi trail north of Hudson Gap, about 10`` diameter. Need chainsaw. | 2009-03-26 | ||||
| 08f | Halloway - Double Hogpen Gap | 1.20 | 3 | Treadway | Sidehilling needs refreshing on the Dominy Knob reroute, just north of Halloway Gap. 200 plus yards of refreshing needed. | 2007-11-19 | T Keene | 2009-01-05 | ||
| 09a | Dyer Gap - Pinhoti Intersection (SFT) | 2.20 | 3 | Signage | One needed at intersection with SFT. No good tree for blazes; easy to miss southbound. | 2008-07-09 | ||||
| 09b | Pinhoti Intersection (SFT) - Pate Gap | 1.60 | 3 | Blazing | Blazing is good at junction with the Pinhoti, and near Watson`s Gap, but very faded, or non-existent, in between. | 2008-01-02 | ||||
| 10c | W | Hemp Top Trail - Hemp Top | 3.10 | 3 | Signage | The Penetentiary Branch sign is down on Hemp Top Trail | 2008-12-20 | |||
| 12c | Kimsey Hwy - McFarland Rd, FS 23 | 2.40 | 3 | Blowdown | Blowdowns reported by Rick Harris. See Rick for details. | 2008-11-14 | ||||
| 16a | Sandy Gap - Round Top, State Line | 3.50 | 3 | Treadway | 1/4 mile in need of sidehilling, from Moss Gap toward Sandy. Needs worktrip | 2007-11-08 | ||||
| 19c | US Hwy 129, Tapoco trailhead - Deals Gap | 5.10 | 2 | Blazing | By AWT volunteer Obie Reynolds: Signs/markers missing for northbounders after crossing 129 bridge. After leaving the highway, sign is found but can not be seen from the road. (Suggest placing on opposite side of treadway so that it\`s visible from the road.) Some blazes need fresh paint. Some sidehill treadway needs rehab. | 2007-05-10 | R & B Harris | 2008-10-12 | ||
W = Wilderness Area; only hand tools allowed.
Green background: work item is pending review; must be opened to accept volunteer assignment.